Full remodel, roll-in ยท Jacaranda, Venice

A roll-in shower built around a toilet that could not move

The waste stack sat in the party wall, which fixed the toilet centre line permanently. Everything else in the room had to be designed around that one immovable point.

Turning circle
60 in achieved
Centre line moved
14 in to 17 in
Clear door
32 in
Shower
36 x 60 in roll-in
01Before and after

The room, either side of the work

Before
Jacaranda, Venice bathroom before the work
  • 8 x 9 ft villa bathroom with a linen closet eating the only turnable corner.
  • Toilet centre line at 14 in from the side wall, too tight for a bar to be reachable.
  • Tub alcove on the exterior wall, 15 in step-over.
  • 30 in door with an inward swing.
After
Jacaranda, Venice bathroom after the work
  • Linen closet removed, releasing a full 60 in turning circle in the centre of the room.
  • Toilet stayed on its stack but the side wall was furred out 3 in to bring the centre line to 17 in.
  • 36 x 60 in roll-in shower on the old tub footprint with a 36 in clear opening and no door.
  • 42 in side bar and 36 in rear bar, both into new 2x10 flat blocking.
  • Door widened to 32 in clear, swing reversed into the hallway.
  • Wall-hung lavatory at 34 in with 27 in knee clearance and insulated drain lines.
02Timeline

How the days ran

14 working days on site. Sample budget $29,700 (sample figure).

  1. Days 1 to 2Demolition, linen closet out, floor opened
  2. Days 3 to 4Framing, wall furring, door widened, plumbing and electrical rough
  3. Day 5Three inspections in one visit
  4. Days 6 to 7Blocking, board, membrane, flood test
  5. Days 8 to 12Pan floated, tile set and grouted
  6. Days 13 to 14Fixtures, bars, lavatory, pull tests, punch list
03The customer

In their words

Three other contractors told me the toilet had to move and it would cost a fortune. Tidewell furred the wall out three inches instead and solved it.

Rosalind A.Jacaranda villa owner
04More work

Other case studies

A Tidewell assessment specialist going through a written report at a homeowner's table

The last thing on this page

Ninety minutes, at your house, for nothing

Joaquin measures the room against every clearance, maps the studs so we know where blocking can go, and leaves a written report. If the honest answer is that your bathroom cannot do what you need, he will say so and the report is still yours.

Office hours
Monday to Friday: 7:30 am to 5:30 pmSaturday: 9:00 am to 2:00 pmSunday: Closed, messages answered Monday
Workshop
2140 Cattlemen Road, Suite 4, Sarasota, FL 34232

We do bathrooms only. If you need a kitchen, an addition or whole-home work we will give you two names of people who do it properly.

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.