
Primary ensuite
The larger footprint, where a 60 in turning circle actually fits
Bathroom specialists for aging in place, Sarasota and Manatee counties
Whole bathrooms
When the layout itself is the problem. Walls move, the door widens, the floor levels, and everything comes back where a body can actually use it.

A full remodel is the only route that lets us change the things that matter most: where the door is, how wide it opens, where the toilet centre line sits, and whether there is 60 in of clear floor to turn in. Surface work cannot fix a bathroom whose bones are wrong.
We take one bathroom at a time and one crew stays on it from demolition to handover. No subcontractor roulette, no week where nobody shows up because the tile setter is finishing someone else's job. The lead carpenter's mobile number is on your schedule.
Bathrooms only. We do not do kitchens, additions, lanais or whole-house work, and we will happily recommend someone who does. Twenty-two years in one room is why we know what is behind your wall before we open it.
Everything below is included as standard. Anything that is an allowance rather than a fixed item is named as one on your quote.
One lead carpenter stays with the job from the first zip wall to the final punch list.
Ninety minutes at your home, free, with a written report.
Drawings, fixture schedule, tile spec. One price, with named allowances.
Sarasota or Manatee County. Typically eight to fifteen business days.
Zip walls, negative air, floor protection. Days 1 to 2.
Plumbing, electrical, framing. Days 3 to 5.
Days 5 to 7.
Days 7 to 11. The slowest and least negotiable part.
Days 11 to 14.
Day 15, with load-test sheets and a written warranty.
If your question is not here, put it to us on the phone. We answer the awkward ones the same way.
Ask a person instead(941) 555-0213All questions and answersAlmost everyone does. We run zip walls with a negative-air machine so dust stays in the bathroom, protect the route from the front door, and clean the path at the end of every day. If it is your only bathroom we will tell you which two days you genuinely need to be elsewhere.
In a house older than about 1990, we usually find something. Our quote carries a named allowance for substrate and framing repair. If we go past it we stop, photograph it, and get your sign-off before continuing. You never get a surprise on the final invoice.
Yes. We pull it, schedule every inspection and meet the inspector. You will never be asked to take a day off work to let someone in.
Because the failure modes in a bathroom are specific and expensive: waterproofing, slope, blocking, ventilation, scald protection. Doing one room ten times a month for twenty-two years is how a crew stops guessing.

The last thing on this page
Joaquin measures the room against every clearance, maps the studs so we know where blocking can go, and leaves a written report. If the honest answer is that your bathroom cannot do what you need, he will say so and the report is still yours.
We do bathrooms only. If you need a kitchen, an addition or whole-home work we will give you two names of people who do it properly.
We value your privacy
We use cookies to run this site, remember your preferences and understand how it is used.Cookie policy